Lane closures on bridges between Hartford, West Lebanon to start later this month

Staff Report

Published: 03-07-2023 4:30 PM

WEST LEBANON — Temporary lane closures on the twin bridges spanning the Connecticut River between Hartford and West Lebanon are expected to start Monday, March 20, according to a news release from the New Hampshire Department of Transportation.

Weather permitting, the contractor, R.S. Audley of Bow, N.H., is expected to resume work on a new median bridge, requiring temporary daytime lane closures on the existing northbound and southbound bridges.

The length of the lane closures will vary on a daily basis, but will generally be between 7 a.m. and 3 p.m.

DOT asks that drivers remain alert within the construction zone and obey all posted signs.

]]>

Yesterday's Most Read Articles

The last of the herd in Randolph Center
Dartmouth graduate student alleges religious discrimination by union
Hanover seeks to manage deer by bringing together landowners and hunters
Bradford village store to close
Animal remains found on former Dartmouth property
Column: Dartmouth created a problem it has yet to solve