Lane closures on bridges between Hartford, West Lebanon to start later this month
Published: 03-07-2023 4:30 PM |
WEST LEBANON — Temporary lane closures on the twin bridges spanning the Connecticut River between Hartford and West Lebanon are expected to start Monday, March 20, according to a news release from the New Hampshire Department of Transportation.
Weather permitting, the contractor, R.S. Audley of Bow, N.H., is expected to resume work on a new median bridge, requiring temporary daytime lane closures on the existing northbound and southbound bridges.
The length of the lane closures will vary on a daily basis, but will generally be between 7 a.m. and 3 p.m.
DOT asks that drivers remain alert within the construction zone and obey all posted signs.
]]>